Skip to content
TurnkeyVN

Guides / Manufacturers

How to Answer a Foreign Buyer's RFQ So You Stay on the Shortlist

September 23, 2026

An RFQ from a Western buyer is a test of judgement before it is a request for a number. The factories that win consistently follow roughly the same method, and it takes less time than the scattered approach most factories use.

Step 1: decide whether to bid, in ten minutes

Before any pricing work, answer three questions.

Can we actually make it well? Size, tolerance class, material, finish. Not can we attempt it, can we hold it repeatedly.

Do we want this order size? A quantity far below or far above your comfortable range usually produces an unhappy project even when you win it.

Is there enough information to quote? If the brief has no quantity, no destination market and no Incoterm, the quotation you produce will not be comparable with anyone else’s.

If the answer to the first two is no, decline in one short message the same day, say why in one sentence, and say what you do take. Buyers keep those replies. A factory that declined honestly once is the first one they contact when the right product comes along.

Step 2: acknowledge the same day

One short message, within business hours if you can:

“Received, thank you. We make similar parts and this looks like a fit. Two questions before we price it: [question one], [question two]. Full quotation by Thursday.”

That message does four things. It confirms you exist and read the brief, it proves someone opened the files, it sets a date, and it starts the conversation before your competitors have replied at all.

Step 3: ask the right questions

Two or three precise questions raise your standing. A long list of basic ones lowers it, especially when the brief already answered them.

Good questions are specific and consequential:

  • Which of these dimensions are critical, and which are reference?
  • Is the finish on the visible face cosmetic or functional?
  • Is the named component fixed, or may we propose an equivalent?
  • Is the quantity a first order or an annual figure?
  • Bulk packed or retail packed with your artwork?

Each of those changes your price. That is what makes them worth asking, and what makes the buyer take them as evidence of competence rather than as delay.

Step 4: review the drawing like a manufacturer

This is the step that wins orders and most factories skip it.

Open the files and look for the thing the buyer got wrong. There is almost always one: an unnecessary tolerance, a feature that needs a side action, a wall thickness that will sink, a material that is hard to source in the quantity involved.

Then say it, with an alternative. Buyers are not offended by this. They are relieved, because the factories that say nothing at this stage are the ones that discover the problem after tooling is cut.

Step 5: build a quotation that can be compared

One page, in this order:

  1. The product described in your words, with one specific observation.
  2. Unit price at the requested quantity, plus one quantity above.
  3. Tooling as its own line, with cavity count, tool life and ownership.
  4. Incoterm with a named port, packaging assumption, lead time split by phase.
  5. Exclusions: certification testing, third party inspection, freight beyond the term.
  6. Your assumptions, listed.
  7. Payment terms and minimum order quantity with its reason.

The assumptions list is what keeps you in the running when information was missing. It converts a guess into a correctable statement.

Step 6: follow up once, with something new

A week later, add rather than ask. A note that you confirmed material availability, or a thought about the tolerance question. Then stop.

Asking repeatedly whether a decision has been made signals free capacity, and buyers read it that way even when it is not true.

When the buyer goes quiet

Usually it means the project stalled on their side, not that you lost. Budgets move, launches slip, and the buyer is often embarrassed rather than uninterested.

A short message two months later, with no pressure and one useful piece of information, restarts more projects than persistence does. Keep a simple list of quoted projects and revisit them quarterly. Factories that do this find that a meaningful share of their orders come from enquiries they assumed were dead.

What this is really worth

Answering RFQs properly is not administration. It is the cheapest sales channel a factory has, because the enquiries already arrived and the only variable is what you send back.

A factory that acknowledges the same day, asks two sharp questions, flags one problem in the drawing and sends a comparable one-page quotation will be on the shortlist for most projects it bids. That is a process change, not an investment.

Templates you can reuse

Three short messages cover most of the process. Write them once, adapt each time.

Same-day acknowledgement. Confirm receipt, one sentence on fit, two specific questions, a date for the full quotation.

Decline with the door open. “Thanks for sending this. We cannot take it because [one concrete reason: the part is larger than our machines, the quantity is below our minimum, we do not run that process in house]. What we do well is [two lines]. If something in that range comes up, please send it.”

Follow-up that adds. One week later, one new piece of information, no request for a decision.

The decline template is the one factories underuse. It takes two minutes, it costs nothing, and it is the message most likely to produce a future enquiry, because buyers rarely receive it.

Keep a record of what you quoted

A simple sheet with the date, buyer, product, quantity, price, assumptions and outcome is worth building from the first RFQ.

Three uses. You can answer a buyer who comes back six months later without reconstructing anything. You can see which categories you win and which you lose, which tells you where to focus. And you can check whether your quoted prices held up against what the job actually cost, which is the only way pricing improves.

Factories without this record quote each job from scratch, repeat the same underpricing, and never find out which kind of work actually makes money for them.

Who should own this

RFQ handling usually sits with whoever answers the email, which means it varies. That is why the same factory can respond brilliantly to one enquiry and lose the next.

One named owner, one method, one template set. The technical review can pull in an engineer, and the price can be approved by management, and the process itself should belong to a single person who is measured on response time rather than on order value. Response time is the part you control.

We send anonymous project previews with the product, processes, quantity, market and timing already stated, so you can decide whether to bid before spending any engineering time. Join the network, and see why quotations get ignored for the failure modes in detail.

Frequently asked questions

Should we answer every RFQ we receive?

No. Quoting work you cannot win or cannot do well costs engineering time and damages your reputation when it goes wrong. A fast, polite decline with a reason keeps the relationship and often brings the buyer back with a product that fits.

How much detail should the first reply contain?

Enough to show you read the files and to keep the conversation moving. An acknowledgement with two or three specific questions on the same day beats a complete quotation a week later, because the buyer is comparing responsiveness as well as price.

What if the buyer will not answer our questions?

Quote against stated assumptions instead of waiting. Write the assumptions at the top: quantity, Incoterm, packaging, tolerance. A quotation with visible assumptions is comparable and correctable. Silence while you wait is not.

Ready to get this quoted?

Send the brief. We match you with up to 3 manufacturers in Vietnam that can carry your scope and reply within 24 business hours.

Get matched with a manufacturer

Keep reading